Construction of Hakkari-Cocuktepe and Golgeliyamac Barrages


DSİ Genel Müdürlüğü - Hakkari-Çocuktepe ve Gölgeliyamaç Barajları İnşaatı - Beton Gövdeli Baraj İnşaatları

Start Date :
05/09/2008
End Date : 04/09/2012
Contract Price : 31.725.709,23 TL


THIS IS “CONSTRUCTION OF HAKKARI COCUKTEPE AND GOLGELIYAMAC BARRAGES” INCLUDING “COCUKTEPE BARRAGES” WHICH WILL BE CONSTRUCTED OVER GUZELDERE STREAM WHICH IS ONE OF THE BRANCHES OF BUYUK ZAPSUYU RIVER, IN THE 4-5 KM. NORTH OF CUKURCA DISTRICT IN HAKKARI WITHIN THE BOUNDARIES OF DSIX. REGIONAL DIRECTORATE AND “GOLGELIYAMAC BARRAGE” WHICH WILL BE CONSTRUCTED OVER GUZELDERE STREAM IN THE NORTH OF CUKURCA DISTRICT IN HAKKARI WITHIN THE BOUNDARIES OF DSI X.REGIONAL DIRECTORATE. The amount and type COCUKTEPE BARRAGE TYPE : roller compacted concrete (SSB) Crest elevation :963,00 m. Thalweg elevation : 918,00 m. Height from Thalweg : 45,00m. Height from groundwork : 54,00 m. Crest length : 127,44 m. Crest width : 8,00 m. SSB DOLUSAVAK location : gövde üstü Type : Karşıdan alışlı, Kapaksız KONDUVI location : Sol sahil Type : Binocular Headwall Headwall internal dimensions : 3,00x3,00 m. Konduvi length : 185,18 m. GOLGELIYAMAC BARRAGE type : roller compacted concrete (SSB) Crest elevation :997,70 m. Thalweg elevation : 956,00 m. Height from Thalweg : 41,70m. Height from groundwork : 51,70 m. Crest length : 150,40 m. Crest width : 8,00 m. SSB DOLUSAVAK location : gövde üstü Type : Karşıdan alışlı, Kapaksız KONDUVI location : Sol sahil Type : Binocular Headwall Headwall internal dimensions : 3,00x3,00 m. Konduvi length : 245,87 m.